PROJECTS
Roof Structure of a New Covered Multi-purpose Court at Rikkyo University Niiza Campus
The roof of the semi-outdoor futsal court was constructed by using a BSS system
combined with PTFE membrane to create a “bright, lightweight structure.”
The BSS were assembled on the ground, and tension was manually applied to the cables. Taking advantage of the lightweight design, the assembled beams were then lifted by crane and installed on top the columns, showcasing a construction method unique to this type of structural system.
Overview
- Structure
- beam string structure(BSS)
- Scale
- 1054 m² (BSS Only)
- Construction Period
- From June to July 2024(BSS only)
- Scope
- Production、construction
- Cable
- BSS Cable Structural spiral rope 1×19 φ20㎜
- Tie rod
- Uplift Prevention High-Tension tie rods NHT690 φ28㎜
- Location
- Saitama Prefecture
- Design
- Nikken Sekkei Ltd.
- General contractor
- Matsui Construction Co., Ltd.